Installation & Site Survey
2.1

Overview

2.2
Installation & Site Survey Guideline
Tools Required
Line of Sight (LOS)
BroadOne GX4000 Manual (R3.0) issue 1.03
This chapter describes how to install and do the site survey for BroadOne
GX4000 E-band IR system. The main topics covered are;
 Installation & Site Survey Guideline
 Unpacking the equipment
 Preparation of Circuit Breaker for ODU
 Antenna fixing to pole
 ODU Installation
 Cable connection between ODU and external equipment
THE GX4000 EQUIPMENT MUST BE INSTALLED BY SUITABLY
QUALIFIED SERVICE PERSONAL.
THE EQUIPMENT CAN ONLY BE INSTALLED IN A RESTRICTED
To ensure the efficiency of an installation, a proper site survey should be
conducted. Prior to start of an installation, an approved survey team should
conduct a survey of the proposed sites. The team should be approved by the
customer and may consist of either contracted surveyors or employees or
both.
The survey team will need:
A pair of Binoculars
Spotting Scope
GPS Navigation Device
Site Survey Report Form
Equipment Requisition Form
Measure Tape
The 70/80 GHz antenna half beam width is very narrow (less than 1 degree).
This reduces the clearance required between the direct path between sites A
and B and buildings alongside the radio path. The required clearance from
obstacles is called a Fresnel zone.
Fresnel zones are a series of concentric ellipsoid areas surrounding the
straight line path between two antennas.
WARNING
ACCESS LOCATION
Installation