Installing The Redundant Power Supply - Lenovo RackSwitch G7000 Installation Manual

Redundant power supply
Table of Contents

Advertisement

Installing the redundant power supply

To install the redundant power supply in a Lenovo System x or IBM Power rack, complete the following
steps:
1. Locate and record the product information to configure and register your product and set aside. See
Before installing the redundant power supply.
2. Remove the rear cover screws.
3. Use the M4 screws to attach the front mounting brackets to each side of the redundant power supply.
Torque the screws to approximately 1.13 Nm (10 inch-pounds).
9
4. Use the M6 screws, washers, and clip nuts to connect the front mounting brackets to the front and rear
posts in the rack. Torque the screws to approximately 3.5 Nm (30 inch-pounds).
14
Lenovo RackSwitch G7000 Redundant Power Supply Installation Guide
9
1
7

Advertisement

Table of Contents
loading

Table of Contents