9.
Install the expansion board.
10. Connect any required internal or external cables to the expansion board.
11. Install the primary PCI riser cage (Install the primary PCI riser cage on page 28).
12. Install the access panel (Installing the access panel on page 25).
13. Install the server in the rack.
14. Connect each power cord to the server.
15. Connect each power cord to the power source.
16. Power up the server (Powering up the server on page 24).
Installing the primary GPU riser and cable option
Prerequisites
This option requires the standard primary PCI riser cage.
Before installing this option, be sure that the power supplies support the installation of this option. For more
information, see the Hewlett Packard Enterprise Configurator website.
In addition, be sure you have the following items:
Installing the primary GPU riser and cable option
71
Need help?
Do you have a question about the ProLiant DL360 Gen10 and is the answer not in the manual?
Questions and answers