Dell Precision 7820 Owner's Manual page 55

Tower
Table of Contents

Advertisement

6
Insert the processor and carrier assembly into the heat sink so that the hooks on the four corners of the carrier are locked into the
openings of heat sink.
NOTE:
After inserting the processor and carrier assembly into the heat sink, double check to see whether the triangle
on the carrier is located on the bottom right corner of the heat sink (when the bottom side of the heat sink is facing
up).
7
Install the processor and heat sink onto the central processing unit (CPU) socket and then secure the four captive screws on the heat
sink to the system board in sequential order (1 > 2 > 3 > 4).
Removing and installing components
55

Advertisement

Table of Contents
loading

This manual is also suitable for:

Precision 7920Precision 5820 tower

Table of Contents