Operating boiler for the first time:
Check that all installation procedures have been carried out.
Ensure water valve is on.
Plug boiler into 13A socket and press power button on the front of the machine marked 'Power'.
Refer to Figure 1.
The "power on" light will glow green and the machine will fill to a safe level, above the elements,
before heating. The display will show the current water temperature and the status " Filling..."
The "Ready/Status" light will cycle two red flashes while the machine is filling to the safe level.
After this amount of water has heated to about 92ºC the boiler will draw more water in until the
temperature drops by 1 or 2 degrees. The boiler will then heat again. This heat fill cycle
continues until the boiler is full.
While filling, the "Ready/Status" light will remain blank.
The "Ready/Status" light will glow green when the machine is both full and up to normal operating
temperature. For 10L machines allow approx 30 minutes.
The boiler is now ready for use – the display will show the Water Temperature and the status "
READY".
The Boiler may now be used to dispense Hot Water to the preset factory settings.
o 90ºC
o Push and Hold operation
o Continuous flow – no pulsing
o Auto heat Fill Mode.
NOTE: Because the boiler is electronically controlled no priming is necessary.
The element cannot switch on until a safe level of water is reached.
1900055
ECO SMART VERSION
1000755A (8.4kW)
Figure 1: Machine User Interface
Power
Button
EcoMode
Button
REV.8
Page 5 of 17
Need help?
Do you have a question about the Ecoboiler UC45 1000743 and is the answer not in the manual?
Questions and answers