ABB SafeRing Installation And Operating Instructions Manual page 16

Sf6 insulated ring main unit and compact switchgear
Table of Contents

Advertisement

SafeRing / SafePlus
SF 6 insulated ring main unit and compact switchgear
Installation and operating instructions
6. Pull out the fuse handle. The fuses are firmly fixed in the
fuse cover.
7. Fix the fuses to the fuse cover using the contact screw
-
The striker must point out from the fuse canister for
the fuse to function properly.
16
NOPOWSR 5976 GB
8. Turn the handle on the fuse cover clockwise to
9. Close the fuse panel.
Fasten the contact
screw on the
locking ring.
close and seal the fuse canister. Use the operating
handle.
The switches are ready for operation.
Fuse
Striker
ABB / PTMV

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Safering plus

Table of Contents