Thermo Scientific LTQ XL Getting Started page 145

Hide thumbs Also See for LTQ XL:
Table of Contents

Advertisement

Thermo Electron Corporation
Setting Up to Introduce Sample by Loop Injection into Solvent Flow from an LC
Vaporizer Heater
Cable Socket
Sheath Gas
Inlet (S)
Sample Inlet
Fitting
Figure 64. APCI probe
4. Connect an appropriate length of PEEK tubing (waste line) from the
divert/inject valve to a waste container, as follows:
a. Connect a length of PEEK tubing with a (stainless steel) nut and
(stainless steel) ferrule to port 6 of the divert/inject valve.
b. Insert the other end of the PEEK tubing into a suitable waste
container.
The MS detector is now set up to introduce sample by loop injection into
solvent flow from an LC.
8
Acquiring APCI Sample Data Using the Tune Plus Window
Auxilary
Gas Inlet (A)
Guide Pin
LTQ XL Getting Started
133

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents