Pioneer MJ-L5 Service Manual page 78

Minidisc recorder; surround processor
Hide thumbs Also See for MJ-L5:
Table of Contents

Advertisement

MJ-L5, SP-L5
QQ
3 7 63 1515 0
(3) MD MECHANISM ASSY
Removal of the Servo Mechanism Assy
1 Remove the screw A.
2 Disconnect the connectors (CN102, CN103, CN105), open the
hook of part A, and tilt the upper side of the MD CORE MAIN
UNIT to the front.
3 Disconnect the connector (CN101) at the rear of the MD CORE
MAIN UNIT and remove the MD CORE MAIN UNIT.
4 After the Carrier has been pushed in, move the Upper Slider to
the rear and stop it at the position where the Under Slider starts
to move.
4
Upper Slider
Rear Side
Carrier
TE
Under Slider
L 13942296513
Part B
7 Remove the Servo Mechanism Assy.
Servo Mechanism Assy
www
.
78
http://www.xiaoyu163.com
Move
5
x
ao
u163
y
i
7
http://www.xiaoyu163.com
2 9
8
2
CN105
Screw A
1
CN102
2
CN101
MD CORE MAIN UNIT
5 Shift part B to the position shown in the figure while raising the
Under Slider. (At the same time, the Upper Slider moves to the
front.)
6 Remove the Lock Plate. (One screw B)
Q Q
3
6 7
1 3
1 5
Under Slider
Screw B
Lock Plate
6
Caution for the time of installation of the servo
mechanism assy
Move the MD Pick-up to the innermost circumference.
After installation of the servo mechanism assembly, shift the
Upper Slider to the rear. (The Under Slider moves at the same
time, and the servo mechanism assy is fixed. When the Under
Slider is slide, this becomes the reason for switching ring
co
catching.)
.
9 4
2 8
CN103
2
3
0 5
8
2 9
9 4
2 8
Upper Slider
m
9 9
Part A
9 9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sp-l5

Table of Contents