On-site connections

WW Hot water
KW Cold water
KWHHot and cold hard water
EL Electrical connection
AG Exhaust gas (gas heated machines)
G
Gas connection (gas heated machines)
AV Drain
Steam connection (steam heated machines)
D
K
Condensate drain (steam heated machines)

Plumbing connections on the machine

Cold water
Hard water
Liquid dispensers
Plumbing
Connection must be made to the water supply via a
tap which conforms to local and national regulations.
This work must be carried out by an authorised
person in strict accordance with local and national
regulations.
IMPORTANT Australia and New Zealand.
This appliance must be installed according to
AS/NZS 3500.1. Back flow prevention is already
integrated in the appliance.
34
Hot water
Cold water
Hard water
Water inlet / drainage
To ensure trouble free operation of the machine, the
flow pressure must be at least 100 kPa (1 bar) and
not exceed 1000 kPa (10 bar).
The inlet pressure tested hoses supplied with the
machine must be used for connection to the water
supply.
If replacing an inlet hose only use a hose tested to at
least 7000 kPa (70 bar) pressure, and for a water
temperature of at least 90 °C.
This also applies to all fittings. Genuine Miele original
parts fulfil these requirements.
Water taken into the machine must not exceed a
temperature of 70 °C.