Peak Load Cut-Out; Service Interval 1 - Miele PT 7186 Vario Operating And Installation Instructions

Table of Contents

Advertisement

Peak load cut-out

Service interval
If the peak-load cut out function is activated the heating will
switch itself off and any programme running will be stopped.
The following message will appear in the display:
Cottons
Drying
Once the peak load has finished the programme will continue
automatically as before.
If after switching the machine the following message appears
in the display the machine will need to be serviced by the
Miele Service Department.
;

Service interval 1

Call the Miele Service Department.
OK
H
Press short cut button D or wait approx. 5 seconds to
return to the main menu.
Frequently asked questions
Peak load
Normal
0:43 h
37

Advertisement

Table of Contents
loading

Table of Contents