5-42 Installing and Using Utilities
Procedure in the ft server utility
Start
1.
Select the target component by using the ft server utility.
2.
Check the current state of the target component with the LEDs.
3.
Click the [Start] button of the target component.
A certain time is required for the start.
The start result can be verified by the LEDs on the target component. The result of the
start operation is registered in the event log.
Stop
1.
Stop before replacing components.
2.
Select the target component by using the ft server utility.
3.
Check the current state of the target component with the LEDs.
4.
Click the [Stop] button of the target component.
A certain time is required for the start.
The start result can be verified by the LEDs on the target component. The result of the
start operation is registered in the event log.
Sample screen of ft server utility