NorthStar 2 kW Installation Manual page 23

Northstar navigation northstar 2 kw radar installation manual
Table of Contents

Advertisement

Identify the connector ends B, C, and D on the 2 kW interconnection cable (NS003101). Connector D is
an Earthing strap.
Place the locking nut, gasket A and gasket B over the end of the interconnection cable in the order
shown, then push the interconnection cable through the cable entry point into the radome. (Ensure
that you push through sufficient cable to easily connect the J connectors.)
At the cable entry point, take care that the grooves in gaskets A and B are opposite each other (see the
figure). Tighten the locking nuts to hold the interconnection cable firmly in place and to provide a
waterproof seal.
Place the internal locking nut over the end of the interconnection cable, then attach connectors B and
C to the J connectors (as shown in the figure).
The broken line shows the route for the interconnection cable.
Attach connector D to one of the screws close by to provide an Earth (as shown in the figure).
23
Northstar 2 kW Radar Installation Manual

Advertisement

Table of Contents
loading

Table of Contents