NEC 1160Xd Installation Procedures Manual page 13

Nec server installation procedures
Table of Contents

Advertisement

The server weighs approximately 926.0 pounds (420.0Kg). If
the server contains optional equipment, it will weigh more.
To avoid personal injury, make sure you have another
person help you unpack the server and two other persons
help you move the server.
Exerting excessive pressure on the server cabinet doors
may damage them. When performing the next step, be sure
to grasp the corner frame of the server when pushing the
server towards the unloading ramp.
14. Position a person at the front of the server (rear of pallet) and one person
standing on the ramp at the rear of the server. Grasp the corners of the
server. Do not put pressure on the center of the front or rear cabinet doors.
See Figure 8.
Figure 8. Rolling the Server Down the Ramp
15. With another person pushing on the front corners of the server, the person
standing on the ramp should stabilize the movement of the server and guide
the server down the center of the unloading ramp. Guide strips are
positioned along the sides of the ramp to prevent the server from falling off
the sides of the ramp. See Figure 8. Remove the server from the shipping
pallet.
16. Once the server is removed from the pallet, remove any bubble-pack and the
shroud that covers and protects the server.
17. With the assistance of another person, move the server to the selected
location in the computer room.
Express5800/1160Xd/1320Xd Installation Procedures 9
!
WARNING
! CAUTION

Advertisement

Table of Contents
loading

This manual is also suitable for:

1320xdExpress5800/1160xdExpress5800/1320xd

Table of Contents