Warnings; Site Preparation - Motorola AP7131 Installation Manual

Hide thumbs Also See for AP7131:
Table of Contents

Advertisement

6

1.2 Warnings

• Read all installation instructions and site survey reports, and verify correct equipment installation before
connecting the Access Point.
• Remove jewelry and watches before installing this equipment.
• Verify the unit is grounded before connecting it to the power source.
• Verify any device connected to this unit is properly wired and grounded.
• Connect all power cords to a properly wired and grounded electrical circuit.
• Verify that the electrical circuits have appropriate overload protection.
• Attach only approved power cords to the device.
• Verify the power connector and socket are accessible at all times during the operation of the equipment.
• Verify there is adequate ventilation around the device, and that ambient temperatures meet equipment
operation specifications.

1.3 Site Preparation

• Consult your site survey and network analysis reports to determine specific equipment placement, power
drops, and so on.
• Assign installation responsibility to the appropriate personnel.
• Identify and document where all installed components are located.
• Ensure adequate, dust-free ventilation to all installed equipment.
• Prepare Ethernet port connections.
• Verify cabling is within the maximum 100 meter allowable length.
AP-7131 Access Point

Advertisement

Table of Contents
loading

Table of Contents