Toshiba LF150 Instruction Manual page 13

Electromagnetic flowmeter detector
Table of Contents

Advertisement

4.1.1 Location
To select the installation site, follow the precautions described below:
Avoid the place where fluid runs in pulsating current.
Avoid the place within the immediate proximity of equipment producing electrical
interference (such as motors, transformers, radio transmitters, electrolyte cells, or other
equipment causing electromagnetic or electrostatic interference).
Avoid the place where excessive pipe vibration occurs.
Avoid the place where there is direct sunlight. If this is unavoidable, use an appropriate
shade. For information concerning a shade, contact Toshiba's Engineering Department.
Avoid the place under corrosive atmospheres or under high humidity condition.
Avoid the place high or a constricted area where clearance for installation or maintenance
work is not provided.
Design piping so that the detector pipe is always filled with fluid, whether the fluid is
flowing or not.
The LF150 detector has no adjustable piping mechanism. Install an adjustable short pipe
where needed.
Chemical injections should be conducted on the downstream side of the detector.
12
6F8A0916

Advertisement

Table of Contents
loading

Table of Contents