Siemens SICHARGE UC Installation And Commissioning Manual page 72

Hide thumbs Also See for SICHARGE UC:
Table of Contents

Advertisement

7
Screw the cable lug of the protective conductor to the ground connection or clamp the grounding
cable with the wire end sleeve into the PE terminal
8
Tighten the screw with the corresponding tightening torque according to the table in the com-
ments section
9
Measure and write down the value of earth loop impedance:
Connections for the DC cables
No.
1
Cut the cables to fit the connection.
2
Remove the sheath of the cable to connect the cable lug
3
Choose a cable lug for the appropriate conductor cross-section
4
Strip the insulation from the end of the cable so that the remaining insulation extends up to the
cable lug
5
Fasten the cable lug correctly to the end of the conductor using a suitable crimping tool
6
Insert a shrink-on sleeve over the cable lug. The shrink-on sleeve must extend slightly beyond the
insulation of the cable and cover the crimping point of the cable lug
7
Use a suitable tool to heat the shrink-on sleeve
8
Clamp the DC cables to the terminals according to the circuit diagram
9
Tighten the screws with a torque of 75 Nm
10
Check the connection of the DC cables to the terminals
11
Apply sealing paint
Connection for the low voltage cable/AC
No.
1
Route the low voltage cable/AC to the electronics box.
2
Cut the cable to the correct length. Consider the length required for the connection inside the
electronics box
3
Remove the cable jacket
4
Insert the cable into the electronics box
5
Route the wires in the cable duct to the terminals
6
With a flexible cable, select the wire end sleeves for the corresponding conductor cross section
7
Strip the ends of the conductors so that the remaining insulation reaches up to the wire end sleeve
8
Fasten the wire end sleeves properly on the conductor ends
9
Clamp the wires according to the circuit diagram
10
Check the connections of the wires to the terminals
Installation and Commissioning Checklist for SICHARGE UC
Product Information, 03/2023, A5E52548271-AA
Checklist item
Checklist item
SICHARGE UC MastPanto
6.3 Connection
P
F
N/A
P
F
N/A
71