GE AKTA pilot 600 User Manual page 106

Table of Contents

Advertisement

5 Maintenance
5.4 Calibration procedures
5.4.2 Calibrate the conductivity monitor
Step
8
9
10
11
12
13
14
Factory calibration procedure
Follow the steps below to restore the conductivity cell constant to the factory default
value.
106
Action
In the Calibration dialog, choose Conductivity monitor - user calibration
in the Monitor to calibrate list.
Flush the conductivity flow cell twice with 25 to 30 mL distilled water, using
a syringe attached to the Luer-to-SNAP connector. Leave the syringe at-
tached to the connector so that solution does not drain from the flow cell.
Flush the conductivity flow cell with conductivity standard solution, using a
syringe attached to the Luer-to-SNAP connector, then wait until the conduc-
tivity reading is stable.
In the Calibration dialog box, enter the theoretical conductivity value at the
current conductivity temperature in the Enter theoretical conductivity
value input field.
If a certified conductivity standard solution is used, use the supplied
theoretical conductivity value.
If a manually prepared 1.00 M NaCl calibration solution is used, see the
graph for conductivity value at the current temperature
values of 1.00 M NaCl, on page
In the Calibration dialog, click Calibrate.
Result: The new conductivity cell constant is displayed in the Conductivity
cell constant/cm box.
In the System Settings dialog box, select Conductivity:Cond temp compen-
sation and set the Compensation factor back to the desired value, default
2.1%. Click OK.
Reconnect the system tubing to the conductivity monitor.
107.
ÄKTA pilot 600 User Manual 29274559 AA
Conductivity

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Akta pilot 600sAkta pilot 600r

Table of Contents