ABB C1900 Installation Manual page 15

Circular chart recorder and recorder/controller
Hide thumbs Also See for C1900:
Table of Contents

Advertisement

Products
Automation Systems
for the following industries:
– Chemical & Pharmaceutical
– Food & Beverage
– Manufacturing
– Metals and Minerals
– Oil, Gas & Petrochemical
– Pulp and Paper
Drives and Motors
AC and DC Drives, AC and DC Machines, AC motors to 1kV
Drive systems
Force Measurement
Servo Drives
Controllers & Recorders
Single and Multi-loop Controllers
Circular Chart , Strip Chart and Paperless Recorders
Paperless Recorders
Process Indicators
Flexible Automation
Industrial Robots and Robot Systems
Flow Measurement
Electromagnetic Flowmeters
Mass Flow Meters
Turbine Flowmeters
Flow Elements
Marine Systems & Turbochargers
Electrical Systems
Marine Equipment
Offshore Retrofit and Refurbishment
Process Analytics
Process Gas Analysis
Systems Integration
Transmitters
Pressure
Temperature
Level
Interface Modules
Valves, Actuators and Positioners
Control Valves
Actuators
Positioners
Water, Gas & Industrial Analytics Instrumentation
pH, conductivity, and dissolved oxygen transmitters and
sensors
ammonia, nitrate, phosphate, silica, sodium, chloride,
fluoride, dissolved oxygen and hydrazine analyzers.
Zirconia oxygen analyzers, katharometers, hydrogen purity
and purge-gas monitors, thermal conductivity.
PRODUCTS & CUSTOMER SUPPORT
Customer Support
We provide a comprehensive after sales service via a
Worldwide Service Organization. Contact one of the following
offices for details on your nearest Service and Repair Centre.
United Kingdom
ABB Limited
Tel: +44 (0)1480 475321
Fax: +44 (0)1480 217948
United States of America
ABB Inc.
Tel: +1 215 674 6000
Fax: +1 215 674 7183
Client Warranty
Prior to installation, the equipment referred to in this manual
must be stored in a clean, dry environment, in accordance with
the Company's published specification.
Periodic checks must be made on the equipment's condition. In
the event of a failure under warranty, the following
documentation must be provided as substantiation:
1. A listing evidencing process operation and alarm logs at time
of failure.
2. Copies of all storage, installation, operating and maintenance
records relating to the alleged faulty unit.

Advertisement

Table of Contents
loading

Table of Contents