Performance Tests
PDH/DSn Receiver Monitor Levels
below.
3 Press
RESULTS
4
Press
RUN/STOP
5 Ensure that NO TROUBLE is displayed on the
30 seconds.
6 Press
RUN/STOP
7 Press
and select EQUALIZATION [ON] GAIN [20 dB].
RECEIVE
8 Connect Cable Simulator E1-M between the PDH OUT Port and the
attenuator.
9 Press
RESULTS
measurement.
10 Ensure that NO TROUBLE is displayed on the
30 seconds. Press
11 Connect the 6dB Fixed Attenuator in the signal path to give a total
path attenuation of 26dB.
12 Press
and select MONITOR LEVEL [26dB].
RECEIVE
13 Press
;
RESULTS
measurement.
14 Ensure that NO TROUBLE is displayed on the
30 seconds. Press
15 Remove Cable Simulator E1-M from the signal path.
TROUBLE SCAN
to start the measurement.
to stop the measurement.
then
TROUBLE SCAN
to stop the measurement.
RUN/STOP
then
TROUBLE SCAN
to stop the measurement.
RUN/STOP
display after
RESULTS
to start the
RUN/STOP
display after
RESULTS
to start the
RUN/STOP
display after
RESULTS
3-41