Performance Tests; Introduction; Equipment Required; Performance Test Record - HP 37718A Installation And Verification Manual

Hide thumbs Also See for 37718A:
Table of Contents

Advertisement

Performance Tests

3
Performance Tests

Introduction

The procedures given in this Section, test the HP 37718A/19A
performance using the Specifications provided, as performance
standards. Tests are intended to be performed in the recommended order
for a full instrument calibration check. Tests can be run individually,
however it will be assumed that any preceding test would meet
specifications.

Equipment Required

Equipment required for the Performance Tests is given in this Chapter.
Any equipment which meets or exceeds the critical specification of the
equipment listed, may be substituted. Recommended models are those
typically used in HP Service Centers. Alternative models are also listed.

Performance Test Record

The results of the Performance Tests may be recorded on the Test
Records at the end of this Chapter. The Performance Test Record lists all
the tested specifications and the acceptable limits. The results recorded
at incoming inspection may be used for comparison during periodic
maintenance, troubleshooting or after repair or adjustment.

Calibration Cycle

This instrument requires periodic verification of performance.
Depending on use and environmental conditions, the instrument should
be checked approximately once every 2 years, using these Performance
Tests.
Option Configuration
Please refer to Chapter 6 and the instrument Specifications for
information on option configuration.
3-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Omniber 719Omniber 71837719a

Table of Contents