Connecting The System - Philips GreenPower LED Series Application Manual

Hide thumbs Also See for GreenPower LED Series:
Table of Contents

Advertisement

Power cable for module length 1.5 m | 4.9 ft
F2
M2
1
Junction box
Option 1
Junction box
F1
M1
1
Power cable
for module length
1.5 m | 4.9 ft
Option 2
Legend
F1
= Female connector for cable tree power cable
= Male connector for cable tree power cable
M1
= End cap for cable tree power cable
E1
= Female connector for cable tree branch or for power cable for module
F2
= Male connector of module
M2
= End cap for cable tree branch cable
E2
= IP66 | UL/CSA dry/damp/wet locations
= NOT IP66 | UL/CSA dry/damp/wet locations
September 2018
Cable tree
F1
F2
F2
F2
E2
M2
M2

Connecting the system

For connecting the module to the mains power, there are
two options:
Option 1 - Power cable for module
Install the GreenPower LED production module by means of
the GreenPower LED power cable for module.
Option 2 - Cable tree with 2-10 branches
Install the GreenPower LED production module by means of
the GreenPower LED production 2.1 cable tree. Connect this
cable tree to the grid with the GreenPower LED power cable
E1
for cable tree.
Connect all power cables to a junction box. Make sure all
junction boxes are mounted to a rigid structure. Cables must
be secured by a cord grip / strain relief. Use a cord grip
suitable for use with three conductor and type off cord
suitable for the trade size of the junction box provided by
others, if needed.
Any unused connector (both power and data) must be
secured and sealed with an end cap (see ordering data).
Otherwise the IP66 and UL rating for wet locations will
be void.
Application Guide - Philips GreenPower LED production module
9

Advertisement

Table of Contents
loading

Table of Contents