INSTALLATION
REQUIREMENTS
TOOLS
AND
PARTS
Gather required tools and parts before starting installation.
Tools needed:
@
Flat-blade screwdriver
#2 Phillips screwdriver
Adjustable or open-end
wrench 9/16" (14 mm)
Level
4 ='miR
(102 mm)_
Wood block
Ruler or measuring tape
Optional
tools:
Flashlight
Parts supplied:
Bucket
NOTE: Remove parts package from the washer basket.
Check that all parts were included.
Front leveling feet with nuts (2)
Shipping strap (Not in parts bag.
See "Remove Shipping Strap.")
Drain hose
Silver double-wire
hose clamp
Tin snips (new vent
installations)
Adjustable wrench that
opens to 1" (25 mm) or
hex-head socket wrench
1/4" nut driver
Wire stripper
(recommended)
Caulking gun and compound
(new vent installations)
Utility knife