GE LP 33 Series Operating Manual

GE LP 33 Series Operating Manual

60 – 80 – 100 – 120 kva 400 vac ce / series 2
Hide thumbs Also See for LP 33 Series:
Table of Contents

Advertisement

GE Digital Energy
Power Quality
LP 33 Series 100 - 120 kVA
LP 33 Series 60 - 80 kVA

Operating Manual

Uninterruptible Power supply
Digital Energy™
LP 33 Series
60 – 80 – 100 – 120 kVA
400 Vac CE / Series 2
GE Consumer & Industrial SA
General Electric Company
CH – 6595 Riazzino (Locarno)
Switzerland
T +41 (0)91 / 850 51 51
F +41 (0)91 / 850 51 44
www.gedigitalenergy.com
GE imagination at work

Advertisement

Table of Contents
loading

Summary of Contents for GE LP 33 Series

  • Page 1: Operating Manual

    GE Digital Energy Power Quality LP 33 Series 100 - 120 kVA LP 33 Series 60 - 80 kVA Operating Manual Uninterruptible Power supply Digital Energy™ LP 33 Series 60 – 80 – 100 – 120 kVA 400 Vac CE / Series 2 GE Consumer &...
  • Page 2 Model: LP 33 Series 60 – 80 – 100 – 120 kVA / Series 2 Issued by: Product Document Department – Riazzino - CH Date of issue: 30.01.2009 File name: OPM_LPS_33E_60K_M12_2GB_V010 Revision: Identification No. Up-dating Revision Concerns Date COPYRIGHT © 2009 by GE Consumer & Industrial SA All rights reserved.
  • Page 3 We thank you for selecting our products and are pleased to count you amongst our very valued customers at GE. We trust that the use of the LP 33 Series Uninterruptible Power Supply system, developed and produced to the highest standards of quality, will give you complete satisfaction.
  • Page 4: Table Of Contents

    LP 33 Series 80 kVA - Power connection with common input mains................... 40 5.8.3 LP 33 Series 100 - 120 kVA - Power connection with common input mains ..............41 5.8.4 LP 33 Series - 60 kVA - Power connection with separate input mains (option) ............... 42 5.8.5...
  • Page 5 8.1.5 Restore to normal operation after “Total Off”..........................78 8.1.6 Restore to normal operation after “EPO – Emergency Power Off”..................79 8.2 PROCEDURES FOR PARALLEL SYSTEM LP 33 Series....................... 80 8.2.1 LP 33 Series Parallel System start-up..............................80 8.2.2 Parallel UPS shutdown with load transfer on manual bypass Q2..................84 8.2.3...
  • Page 6: Safety Rules

    SAFETY RULES With this document, GE gives to the user all the necessary information about the correct use of the UPS. Please read carefully this Operating Manual before installing or operating the UPS. We recommend that this manual be kept next to the UPS for future references.
  • Page 7: Important Safety Rules

    It is important that air can move freely around and through the unit. • Do not block the air vents. • Avoid locations in direct sunlight or near heat sources. Modifications reserved Page 7/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 8 Observe carefully the safety instructions to prevent risk of electrical shock. Parallel version secured with RPA When included in the text, this symbol refers to operation needed only for Parallel System. Modifications reserved Page 8/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 9 9 Where conductors may be exposed to physical damage, protect the conductors in accordance with all applicable codes. 10 If you are replacing the battery or repairing battery connections, shut OFF the UPS and remove the battery fuses. Modifications reserved Page 9/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 10: Safety Symbols And Warnings

    DANGER OF HOT SURFACE Used to indicate conditions of elevated temperature on some parts. DO NOT TOUCH Risk of parts with hazardous voltages or parts in movement. Modifications reserved Page 10/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 11: Layout

    (rectifier + bypass) Terminals separate mains input connection (optional) Terminals for load output connection X2 X3 Terminals for external battery connection Fig. 2.1-3 General view without protection panels Modifications reserved Page 11/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 12: Layout Lp 33 Series 100 - 120 Kva

    (rectifier + bypass) Terminals separate mains input connection (optional) Terminals for load output connection Terminals for external battery connection Fig. 2.2-3 General view without protection panels Modifications reserved Page 12/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 13: Introduction

    INTRODUCTION GENERAL DESCRIPTION The LP 33 Series Uninterruptible Power Supply (UPS) provides the energy supply for critical loads which need a reliable, continuous free from voltage disturbances and frequency fluctuations supply. In case the mains fails, or it exceeds the permitted tolerances, the energy to supply the load is furnished by the battery with a backup time dependent on its capacity, until the mains recovers.
  • Page 14: Description

    If chosen the ECO Mode, the SSM transfer the load from mains to inverter in case the utility fails. Back-Feed Protection All LP 33 Series UPS’s are equipped with an automatic system for the protection against voltage back feeding towards Utility, through the Bypass (Applied Standard IEC 62040-1).
  • Page 15: Operation Modes

    ECO Mode cannot be enabled for RPA Parallel System. Attention: A single unit equipped with a RPA - Parallel board, must be considered as parallel, thus disabling ECO Mode. Modifications reserved Page 15/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 16 When enough inverters to supply the load have been restarted, the load will be transferred from the automatic bypass back to the inverter bus-bars. Modifications reserved Page 16/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 17 As the warning occurs on one unit necessary to support the present load, the system starts the timeout (selectable) of “stop operation” and then the output load shuts down. Modifications reserved Page 17/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 18: Rpa Parallel System

    RPA PARALLEL SYSTEM The RPA (Redundant Parallel Architecture) allows to extend the unit to a Parallel System with 2, 3, or 4 units LP 33 Series connected on the same bus, which ensure the highest reliability rate and increase the power availability.
  • Page 19: Ups Paralleled On The Same Battery

    A Parallel System with a Common Battery for two or more UPS, requires a particular installation and adequate setting of some parameters, (accessible only through password), and can therefore only be done by a qualified GE engineer. Usually each UPS Unit runs with its own Battery.
  • Page 20: Service And Technical Support

    Fig. 4.5-1 Identification label WARRANTY GE, operating through its authorised agents, warrants that the standard products will be free of defects in materials and workmanship for a period of 24 months (12 months for battery), after the date of the invoice, or such other period as may be specified.
  • Page 21: Recycling At The End Of Service Life

    WARNING ! Leads contained in the batteries is a dangerous substance for the environment, therefore it must be correctly recycled by specialised companies! Modifications reserved Page 21/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 22: Installation

    WARNING ! When loading / downloading and when moving the UPS, it is forbidden: When loading / downloading and when moving the UPS, pay attention to: Modifications reserved Page 22/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 23: Dimensions And Weights

    60 kVA 80 kVA standard shipping 295 Kg / 651 lbs 320 Kg / 706 lbs Fig. 5.1.1-2 Dimensions LP 33 Series 60 - 80 kVA 745mm LP 33 Series 100 - 120 kVA 720mm 725mm 720mm x 745mm x 1815mm...
  • Page 24: Delivery

    Service Centre before putting the UPS into operation. NOTE ! In case of storage of the UPS pay attention to: SENSITIVE SENSITIVE SENSITIVE FRAGILE TO DAMPNESS TO HEAT TO FROST Modifications reserved Page 24/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 25: Storage Of The Battery

    2 months with storage temperature 35°C (95°F) NOTE ! In case of battery storage pay attention to: SENSITIVE SENSITIVE SENSITIVE FRAGILE TO DAMPNESS TO HEAT TO FROST Modifications reserved Page 25/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 26: Place Of Installation

    We strongly advice that the ambient temperature should not exceed 20° ÷ 25°C / 68° ÷ 77°F (max. 35°C / 95°F). See Section 5.5. Positioning of the UPS LP 33 Series 60 – 80 - 100 - 120 kVA Min.
  • Page 27 Fig. 5.4-2 LP 33 Series 60 - 80 kVA – Opening on the bottom cabinet Fig. 5.4-3 LP 33 Series 100 - 120 kVA - Opening on the bottom cabinet LP 33 Series opening is provided on the bottom of the UPS for the connection of input and output cables.
  • Page 28 Fig. 5.4-7 LP 33 Series 60 - 80 kVA – RPA Parallel System disposition In case of Parallel System, try to place the UPS modules in sequence of their numbers (marked on the packing). If the units are positioned “side by side”, the side panels must be...
  • Page 29: Ventilation And Cooling

    LP 33 Series 100 kVA 1815 m 290 m 6.21 kW 0.97 kW LP 33 Series 120 kVA 2175 m 350 m 7.45 kW 1.17 kW Modifications reserved Page 29/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 30: Unpacking

    Included in the delivery you can find the following parts: • An accessories bag • Control Bus cables (only for RPA Parallel System) • CD-ROM connectivity Modifications reserved Page 30/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 31 PACKING MATERIAL RECYCLING GE, in compliance with environment protection, use only environmentally friendly material. UPS packing materials must be recycled in compliance with all applicable regulations. Modifications reserved Page 31/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 32: Electrical Wiring

    UPS can be moved for maintenance purpose. It is recommended to use flexible input/output conductors with suitable length to admit a sufficient displacement. Modifications reserved Page 32/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 33: Fuse Discrimination (Co-Ordination Of Breakers Tripping)

    If the selectivity must be ensured also in case of mains failure (that means inhibit automatic bypass), the largest fuse in the output distribution must be lower than 20% of the UPS rated current for each phase. Modifications reserved Page 33/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 34: Fuse Ratings

    3 x 160 A 3 x 200 A LP 33 Series 120 kVA 3 x 200 A 3 x 200 A 3 x 200 A 3 x 250 A Modifications reserved Page 34/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 35: Input / Output Cable Ratings

    3 x 150 + 95 mm NOTE ! According to EMC standards, the connection between the UPS and an external battery must be done using a shielded cable! Modifications reserved Page 35/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 36: Installation Requirements

    5.7.4 Installation requirements Typical examples for the connection of the LP 33 Series 60 – 80 - 100 – 120 kVA. Single UPS with common input for rectifier & bypass Single UPS with separate input for rectifier & bypass (option)
  • Page 37: Electrical Connection

    Once the power cables have been connected, re-install the internal safety shields and close the cabinets by re-installing all external panels. Fig. 5.8-1 LP 33 Series 60 - 80 kVA Fig. 5.8-2 LP 33 Series 100 - 120 kVA Power IN / OUT connections...
  • Page 38 Two independent lines (F2 and F3) supply separately the rectifier and the bypass inputs. With this configuration, when the rectifier-input fuses are opened, the automatic bypass and the maintenance bypass are supplied by the other line. Modifications reserved Page 38/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 39: Lp 33 Series 60 Kva - Power Connection With Common Input Mains

    5.8.1 LP 33 Series 60 kVA - Power connection with common input mains Load Mains 1 Battery Fig. 5.8.1-1 Terminals for common input mains X1 Mains 1 X3 Load Mains input connection Load output connection L1-1 = Rectifier + Bypass Phase L1...
  • Page 40: Lp 33 Series 80 Kva - Power Connection With Common Input Mains

    5.8.2 LP 33 Series 80 kVA - Power connection with common input mains Load Mains 1 Battery Fig. 5.8.2-1 Terminals for common input mains X1 Mains 1 - Mains input connection X3 Load - Load output connection L1-1 = Rectifier + Bypass Phase L1...
  • Page 41: Lp 33 Series 100 - 120 Kva - Power Connection With Common Input Mains

    5.8.3 LP 33 Series 100 - 120 kVA - Power connection with common input mains Load Mains 1 Battery Fig. 5.8.3-1 Terminals for common input mains X1 Mains 1 - Mains input connection X3 Load - Load output connection L1-1 = Rectifier + Bypass Phase L1...
  • Page 42: Lp 33 Series - 60 Kva - Power Connection With Separate Input Mains (Option)

    5.8.4 LP 33 Series - 60 kVA - Power connection with separate input mains (option) NOTE ! Neutral of rectifier input and neutral of bypass input must be coming from the same input bar. Inside the UPS, neutrals N1 and N are connected together.
  • Page 43: Lp 33 Series 80 Kva - Power Connection With Separate Input Mains (Option)

    5.8.5 LP 33 Series 80 kVA - Power connection with separate input mains (option) NOTE ! Neutral of rectifier input and neutral of bypass input must be coming from the same input bar. Inside the UPS, neutrals N1 and N are connected together.
  • Page 44: Lp 33 Series 100 - 120 Kva - Power Connection With Separate Input Mains (Option)

    5.8.6 LP 33 Series 100 - 120 kVA - Power connection with separate input mains (option) NOTE ! Neutral of rectifier input and neutral of bypass input must be coming from the same input bar. Inside the UPS, neutrals N1 and N are connected together.
  • Page 45: Rpa Parallel System - Control Bus Connection

    2 - Remove the front panel “B”. 3 - Remove with appropriate tool the metallic window “C” from the metal screen “D”. Fig. 5.8.7-1 LP 33 Series 60 - 80 kVA - Access to the RPA board NOTE ! Put in place the front panel “B”...
  • Page 46 NOTE ! Connection and commissioning of an additional UPS to an existing Parallel System, must be performed by a service engineer from of your Service Centre. Modifications reserved Page 46/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 47 Fig. 5.8.7-5 LP 33 Series 60 - 80 kVA – Control bus location RPA Parallel System Fig. 5.8.7-6 LP 33 Series 100 - 120 kVA – Control bus location RPA Parallel System Control bus location RPA Parallel System Place the cables and connect them as indicated in the diagram Fig. 5.8.7-5/6 following these procedures: •...
  • Page 48: Ups Functioning As Frequency Converter

    UPS FUNCTIONING AS FREQUENCY CONVERTER When the UPS LP 33 Series is delivered as frequency converter (different output frequency with respect to the input frequency), the automatic bypass and manual bypass functions are disabled. Therefore the load cannot be transferred to mains in case of overload, short circuit, or inverter failure.
  • Page 49: System Handling

    English, German, Italian, Spanish, French, Finnish, Polish, Portuguese, Czech, Slovakian, Chinese, Swedish, Russian and Dutch. − Synoptic diagram indicating UPS status. Command keys and parameters setting. • UPS status control LED. • Modifications reserved Page 49/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 50: Table Of Functions And Indications On Control Panel

    The “Total Off” reset must be done only on one unit connected to the parallel bus (switch Q1 closed). NOTE ! Special care must be taken in using this command, in order to avoid accidental load disconnection. Modifications reserved Page 50/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 51 History of events (alarms and messages). • Functionality can be programmed to meet • customer needs by changing parameters. Operation commands of the UPS. • Modifications reserved Page 51/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 52: Command Switches

    Fig. 6.3-1 Q1 and Q2 switches NOTE ! Mains failure of long duration or low Battery voltage will cause the automatic shutdown of the UPS, thus preventing damage to the Battery. Modifications reserved Page 52/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 53: Lcd Screen

    It is possible to view any key functional description by pushing the key for more than 3 seconds. Pushing the key “MEASURES” and “ALARMS” together automatically sets the LCD communication for “ENGLISH”. Modifications reserved Page 53/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 54 Examples of typical scenarios in the synoptic diagram: Load supplied by inverter Load supplied by automatic bypass Load supplied by manual bypass Q2 Load supplied by battery Modifications reserved Page 54/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 55: Metering

    Input line voltage L1, L2 and L3 phases. 395 V 393 V 400 V Voltage of positive (+) booster string. 400 V Voltage of negative (-) booster string. Modifications reserved Page 55/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 56 ECO MODE RATE 70 % The statistic evaluation in % (100= good; 0= bad) of the utility, for the ECO mode operation. Modifications reserved Page 56/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 57: Alarms

    Confirm the selection made. It is possible to view any key functional description by pushing the key for more than 3 seconds. The events displayed are the standard GE events as described in the Section 7.3.1 - EVENTS (Alarms and Messages).
  • Page 58: Events (Alarms And Messages)

    Each of the following listed events, alarm or message, can be displayed on the LCD screen, on a PC with the software “GE Data Protection” installed or with the monitoring system “GE Power Diagnostic”. Alarms and Messages are differently specified because the alarms are indicating an abnormal...
  • Page 59 (default 30 seconds). 4530 LOAD LOCKED ON MAINS Transfer will be free again after a time defined by respective parameter (default 30 seconds). Modifications reserved Page 59/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 60 Load Off after time-out of “stop operation” with missing LOAD OFF DUE mains due to battery low voltage or overtemperature 4999 TO LOW BATT. OR TEMP. condition. Modifications reserved Page 60/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 61: Messages List

    NO BYPASS POWER or K6 opening occurred. 2 transfers inverter-mains have been detected in a short 4534 MULTIPLE LOAD TRANSFER time, defined by respective parameter (default 30 seconds). Modifications reserved Page 61/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 62 Commands source can be chosen depending on the value of respective parameter (password required): 4764 REMOTE CONTROL OFF 0 = Only local panel 1 = Only Remote Control 2 = Both Modifications reserved Page 62/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 63: Event Report Lp 33 Series

    ..............................................Modifications reserved Page 63/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 64: Setup

    The UPS serial number. UPS SW Version : xxx Display SW Version : xxx UPS SW The UPS software version. Display SW The LCD display software version. Modifications reserved Page 64/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 65 If the desired number is shorter than 40 characters, the string will finish with blanks. Tel 1 enabled This parameter Y/N specifies if the first telephone number (Tel 1) will be used for dial-out. Modifications reserved Page 65/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 66 The number of ECO Mode hours per weekday (from d1 - Saturday to d7 - Friday) is displayed in the operation mode parameter window (ceiling value). Modifications reserved Page 66/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 67 Note that on day d6 - Thursday the interval has length 0 (zero), therefore the ECO Mode is not enabled on this day. Modifications reserved Page 67/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 68 • ECO mode screen how many hours of ECO Mode operation have been selected for each day of the week. NOTE ! The ECO Mode will become active only if the load is supplied from the inverter. Modifications reserved Page 68/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 69: Commands

    RESET TOTAL OFF RESET TOTAL OFF of “Total Off” is finished the “REQUEST TOTAL OFF” REQUEST TOTAL OFF CANCEL TOTAL OFF screen appears again. EXECUTE TOTAL OFF Modifications reserved Page 69/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 70: Operation

    LED 1 (mains rectifier OK) and LED 2 (mains bypass OK) must be lit. Press “MUTE” key to reset acoustical alarm. LED Alarm remains lit. ► Continue Modifications reserved Page 70/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 71 During the first commissioning LP 33 Series requests a set up of the UPS configuration parameters presented in the following screens. Without such configuration it is not possible to continue with the commissioning procedure. WARNING ! The setup of the UPS configuration parameters must be done only by QUALIFIED AND TRAINED PERSONNEL.
  • Page 72 CONFIGURATION Save and exit ? Screen to save the configuration of set parameters. Any additional modification of setup parameters can be done only by a GE SERVICE PERSON as it requires an access code. ► Continue Modifications reserved Page 72/103 OPM_LPS_33E_60K_M12_2GB_V010.doc...
  • Page 73 BY INVERTER”. Load supply. Your LP 33 Series UPS is now running in VFI mode, supplying power to the output. Insert the loads one by one to the output of the UPS. Check the output current value of L1, L2 and L3 and check for correct load balance.
  • Page 74: Ups Shutdown With Load Transfer On Manual Bypass Q2

    − Remove the fuses from their place, re-install and close fully the cover of fuse-holder. The acoustical alarm is activated, press “MUTE” key to reset it. Continue ► Modifications reserved Page 74/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 75 Apart from the front door, do not open any other part of the UPS. NOTE ! With separate mains inputs, it’s possible to disconnect mains rectifier. Modifications reserved Page 75/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 76: From Manual Bypass Q2 To Normal Function Vfi

    Some seconds later the load will be transferred on inverter. LED Alarm turn Off and the LED Operation must be lit. The synoptic diagram must display the status “LOAD SUPPLIED BY INVERTER”. END OF PROCEDURE Modifications reserved Page 76/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 77: Complete Ups Shutdown

    Wait until capacitors are completely discharged before starting the UPS again. Apart from the front door, do not open any other part of the UPS. Modifications reserved Page 77/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 78: Restore To Normal Operation After "Total Off

    Some seconds later the load will be transferred on inverter. LED Alarm turn Off and the LED Operation must be lit. The synoptic diagram must display the status “LOAD SUPPLIED BY INVERTER”. END OF PROCEDURE Modifications reserved Page 78/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 79: Restore To Normal Operation After "Epo - Emergency Power Off

    Some seconds later the load will be transferred on inverter. LED Alarm turn Off and the LED Operation must be lit. The synoptic diagram must display the status “LOAD SUPPLIED BY INVERTER”. END OF PROCEDURE Modifications reserved Page 79/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 80: Procedures For Parallel System Lp 33 Series

    LED 1 (mains rectifier OK) and LED 2 (mains bypass OK) must be lit. Press “MUTE” key to reset acoustical alarm. LED Alarm remains lit. ► Continue Modifications reserved Page 80/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 81 During the first commissioning LP 33 Series requests a set up of the UPS configuration parameters presented in the following screens. Without such configuration it is not possible to continue with the commissioning procedure. WARNING ! The setup of the UPS configuration parameters must be done only by QUALIFIED AND TRAINED PERSONNEL.
  • Page 82 CONFIGURATION Save and exit ? Screen to save the configuration of set parameters. Any additional modification of setup parameters can be done only by a GE SERVICE PERSON as it requires an access code. ► Continue Modifications reserved Page 82/103 OPM_LPS_33E_60K_M12_2GB_V010.doc...
  • Page 83 LP 33 Series Parallel System is now running, supplying power to the output. Insert the loads one by one to the output of the LP 33 Series Parallel System. Check the output current value of L1, L2 and L3 and check for correct load balance.
  • Page 84: Parallel Ups Shutdown With Load Transfer On Manual Bypass Q2

    − Remove the fuses from their place, re-install and close fully the cover of fuse-holder. The acoustical alarm is activated, press “MUTE” key to reset it. Continue ► Modifications reserved Page 84/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 85 Apart from the front door, do not open any other part of the UPS. NOTE ! With separate mains inputs, it’s possible to disconnect mains rectifier. Modifications reserved Page 85/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 86: From Manual Bypass Q2 To Normal Function Vfi

    LED Alarm turn Off and the LED Operation must be lit. The synoptic diagram, on all UPS units, must display the status “LOAD SUPPLIED BY INVERTER”. END OF PROCEDURE Modifications reserved Page 86/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 87: Separate A Ups Unit From The Parallel System (System Redundancy)

    J3 and J4 connected to the board “P16 - Connector adapter RPA” (see Section 5.8.4). For any further intervention contact nearest Service Centre. Modifications reserved Page 87/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 88: Reconnect A Ups Unit To A Parallel System

    LED Alarm turn Off and the LED Operation must be lit. The synoptic diagram, on all UPS units, must display the status “LOAD SUPPLIED BY INVERTER”. END OF PROCEDURE Modifications reserved Page 88/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 89: Complete Parallel System Shutdown

    Wait until capacitors are completely discharged before starting the UPS again. Apart from the front door, do not open any other part of the UPS. Modifications reserved Page 89/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 90: Restore To Normal Operation After "Total Off

    LED Alarm turn Off and the LED Operation must be lit. The synoptic diagram, on all UPS units, must display the status “LOAD SUPPLIED BY INVERTER”. END OF PROCEDURE Modifications reserved Page 90/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 91: Restore To Normal Operation After "Epo - Emergency Power Off

    LED Alarm turn Off and the LED Operation must be lit. The Synoptic diagram, on all UPS units, must display the status “LOAD SUPPLIED BY INVERTER”. END OF PROCEDURE Modifications reserved Page 91/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 92: Customer Interface

    LP 33 Series 100 - 120 kVA Fig. 9-1 Slot connectivity LP 33 Series is supplied by a standard Serial Port J27 - RS232 (see Section 9.1) and a Relay Card (see Section 9.2). List of possible connectivity configurations on LP 33 Series Slot 1 –...
  • Page 93: Serial Port J27 - Rs232

    Serial Port J27 – RS232 Serial Port J27 - RS232 (sub - D, female 9 pin) Total remote management of the system using software GE Power Diagnostics, GE Data Protection or GE Service Software for system protection and management of the UPS systems.
  • Page 94: Relay Card

    The function GEN-ON is not available on the Relay Card. In case this function is needed, the optional Customer Interface card must be installed (see Section 10.2.1). Modifications reserved Page 94/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 95: Epo (Emergency Power Off)

    X7 / 1, 2 of the P1 – Mainboard. NOTE ! Check that the Jumper JP5 is Fig. 9.3-1 LP 33 Series 60 - 80 kVA - Terminals X7 – EPO not installed on the P1 - Control board.
  • Page 96: Options

    UPS. Based on the leading Intelligent Remote Information System IRIS all GE UPS types as well as 3rd party UPS are supported. Accessing the latest site information via Web and being alerted by Email, SMS or Fax, it enables the user to make timely decisions in case of changing critical conditions.
  • Page 97: Options Assembly And Connection

    P2 – Mainboard are OFF (see Fig. 10.2.1-3). NC = Normally Closed Programmable functions on input contacts X1/10, 21 or J2/10, 23 Programmable X1/11, 22 or J2/11, 24 Programmable / Generator ON (NO) Modifications reserved Page 97/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 98 Consult your nearest Service Centre for more information. In a Parallel System a separate NO (Normally Open) contact must be connected to each individual unit. Modifications reserved Page 98/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 99 In case of a Parallel System press the key “O” (Inverter OFF) on the control panel of each unit connected on the parallel bus and having its output switch Q1 closed. Modifications reserved Page 99/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 100: Optional Battery Cabinet Connection

    O F F electromagnetic fields. LP 33 Series 60 - 80 kVA LP 33 Series 100 - 120 kVA Fig. 10.2.2-2 PCB P1 – Control board Modifications reserved Page 100/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 101: Maintenance

    The service life of the battery is from 3 to 6 years, depending on the operating temperature and on the number of discharge cycles. The UPS LP 33 Series offers the possibility of SBM (Superior Battery Management). The function SBM can be activated through a service Parameter.
  • Page 102: Notes

    It is recommended to note in this section Notes, with date and short description all the operations performed on the UPS, as: maintenance, components replacement, abnormal situations, etc. . Date Description Done by Modifications reserved Page 102/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...
  • Page 103: Annex

    The UPS Schematic Diagrams are included in the CD- ROM, together with the Operating Manual. 13.3 CD-ROM CD-Rom The enclosed CD-Rom contains the complete documentation in various languages. Modifications reserved Page 103/103 OPM_LPS_33E_60K_M12_2GB_V010.doc Operating Manual LP 33 Series 60-80-100-120 kVA / S2...

Table of Contents