Step 2, Move Range Indoors - GE Range Installation Instructions Manual

30", 36" and 48" professional ranges
Table of Contents

Advertisement

Available languages

Available languages

STEP 2
MOVE THE RANGE INDOORS
1 Tilt the range forward on the skid.
2 Lift the toekick out of the foam base.
3 Tilt the range to one side and remove the foam block.
Installation Preparation
Toekick
Toekick
4 Slide the blade of the hand-truck beneath
the front and back legs.
IMPORTANT: Place the hand-truck straps below
the oven door handles.
5 Tilt the range to lower the hand-truck wheels
off the skid.
6 Move the range indoors. Position the range
in front of the installation location.
7 Place the appliance runners on the floor
at the left and right sides of the opening.
The runners provide a surface for rolling
the range into the final position and will protect
the floor finish. The runners must be removed
before leveling the range.
12
Insert Blade Under
the Range Legs
Hand-Truck
Straps Below
Oven Door
Handles
Range
Range
Opening
Opening
Runners
Runners
for Rolling
To Support
the Range
Leveling Legs
into Position
Panel

Advertisement

Table of Contents
loading

Table of Contents