Installation; Step 2, Remove The Packaging; Step 3, Check Installation Hardware - GE Monogram ZV850 Installation Instructions Manual

36" island vent hood
Hide thumbs Also See for Monogram ZV850:
Table of Contents

Advertisement

2
The vent hood is packed separate from the
required accessory ZX858, ZX859 or ZX8510.
Step
• Remove the frame, cover, parts box, side bars
and packaging.
Remove the
• Remove junction box cover.
• Install strain relief onto junction box cover.
Packaging
3
Locate the hardware accessory box packed
with the hood and check contents.
S tep
Check

Installation

Hardware
Check contents of the required
accessory, ZX858, ZX859 or ZX8510.
8
4 Flat Washers
4 Hex head
wood lag screws
(6mm x 2-1/2")
or
(1/4 x 2-1/2")
2 Phillips Head
Decorative Screws
3 Filters
Support Frames
with 8 Screws
and 8 Washers
Installation
36" Island Vent Hood
8 Frame Attachment
Screws with Washers
(attached to
accessory support
frames)
4 (10mm) Nuts and Lock Washers
Check service manual envelope taped
to the front on the hood to be sure it
contains one stop screw. Leave this
screw in the envelope.
Mounting Screw Holes
Front of Hood
Template
2 Side Bars With 4 Machine Screws
Decorative Duct Covers

Advertisement

Table of Contents
loading

Table of Contents