Chapter 2. Initial Setup - GE TransPort PT878 User Manual

Transport portable liquid flowmeter
Hide thumbs Also See for TransPort PT878:
Table of Contents

Advertisement

Chapter 2. Initial Setup

Before making measurements, you must prepare the PT878 for operation.
This includes the following procedures:
Making Electrical Connections
Charging and/or Replacing Batteries
Powering On and Off
Using the Screen and Keypad
Obtaining On-Line Help
Figure 1 below shows the PT878 in its standard soft case (a) and in the
optional solid case (b). In the solid case, the interior is structured for optimal
protection of the PT878 and its accessories.
(a)
Transport® Model PT878 Portable Liquid Flowmeter User's Manual
Figure 1: The PT878 and Accessories
Chapter 2. Initial Setup
(b)
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents