INSTALLATION
- DEEP WELL
1" DISCHARGE
TO SERVICE
PRIMING PLUG
'_
f
PRESSURE SWITCH _
F
CAPTIVE
AIFI_ TANK
" REGULATOR
PLASTIC
1-1/4" SUCTION LINE
PIPE
TANK PIPING
1-1/4' STEEL PIPE
CHECK VALVE
1"
PLASTIC
PIPE-
1-1/4"
1=
PLASTIC
PIPE
WELL SEAL
ADAPTERS
END VIEW
SIDE VIEW
SINGLE PIPE
INSTALLATION
CHECK VALVE _
AND STRAINER
DOUBLE PIPE
INSTALLATION
Fi-g_-re- I _'Captive
Air e Pressure Tank Installation
- Deep Well
/
1" DISCHARGE
TO SERVICE
PRIMING
PRESSURE
SWITCH "_
STANDARD PRESSURE TANK
END VIEW
SIDE VIEW
REGULATOR
PLASTIC
PIPE
1-1/4"
_1-1/4 SUCTION LINE
I 1" DRIVE UNE
VOLUME CONTROL
VERTICAL CASING
TUBING
ADAPTER
AIR VOLUME
CONTROL
1-114
JET WITH BUILT-IN
SINGLE PIPE
INSTALLATION
Figure 2 - Standard
Pressure Tank Installation
- Deep Well
DOUBLE PIPE
INSTALLATION