Craftsman ZT 7000 Operator's Manual page 8

2-bin bagger
Hide thumbs Also See for ZT 7000:
Table of Contents

Advertisement

Available languages

Available languages

CONNECTING
TUBES
Connecting
Upper & Middle Tube
1. Attach upper tube (B, Figure 7) to middle tube (A)
using clevis pins (E) as shown.
Secure with washers
(D) and hair pins (C).
2. Reach through upper tube (B) to insert clevis pins(E).
Note: Pivoting the tubes on the clevis pins may give bet-
ter access for connecting washers and pins.
Figure 7. Assemble Bagger Tubes
A. Middle Tube
B. Upper Tube
C. Hair Pins
D. Washers
E. Clevis Pins
Lower
Tube
Installation
1. Lift discharge deflector up (D, Figure 8).
2. Insert lower chute rod (A) into mounting plate (B).
3. Pull rubber strap (C) and secure by placing hole clos-
est to knob in strap completely over Iocknut (E).
I
I
Figure 8. Install Lower Tube
A. Lower Chute Rod
B. Mounting Plate
C. Rubber Strap
D. Discharge Deflector
E. Locknut

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

107.24907

Table of Contents