Cisco WS-C2950T-48-SI Hardware Installation Manual page 67

Catalyst 2950 series switch
Hide thumbs Also See for WS-C2950T-48-SI:
Table of Contents

Advertisement

Chapter 2
Installation
Figure 2-23 Crimping the Ground Lug
Use the two number-10-32 screws to attach the ground lug and wire assembly to the switch rear panel
Step 5
RPS connector cover, as shown in
Using a ratcheting torque screwdriver, torque each ground-lug screw to 15 lbf-in. (240 ozf-in.)
Step 6
Figure 2-24 Torquing Ground-Lug Screws
RA TI NG
10 0- 12 7V
20 0- 24 0V
50 -6 0H z
OL-6156-01
DC IN PU
T FO R RE
~
PO W ER
M OT E
@ 1A
SP EC IF
SU PP LY
IE D IN M
~
AN UA L.
@ 0. 5A
+1 2V @
4. 5A
Figure
2-24.
CO NS OL
E
Catalyst 2950 Switch Hardware Installation Guide
Installing the Switch
Torque to 15 lbf-in.
2-21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents