GE OSKF Instruction Manual page 8

Current transformer
Table of Contents

Advertisement

Instruction Manual
Unpacking the transformer shall be
made with caution:
1) Remove the smaller extremities;
2) Remove the upper cover;
3) Remove the larger extremities.
NEVER lift a transformer by its primary
terminal. Lift it by the lifting eyes on the
transformer top. See pictures to proceed:
To lift the transformer with crane or
munck, follow the marks on the wooden
crate, once they indicate the right
position for the slings (nylon belts
reinforced)
and avoids blows and
vibrations.
© GE Grid Solutions
Follow the instructions shown in the
drawing below for lifting the CT. All
cables or slings shall be kept in vertical
position
during
recommended to lift the transformer
slowly.
A = 120 mm
These wood blocks should be
fixed on the support. The plank
height shall allow having a
distance of 500mm between
the support and transformer's
feet when CT is in horizontal
position.
Synthetic foam cushion to absorb
impact
During handling, the
cables must be kept
in vertical position
the
lifting.
It
is
During handling,
the cables must
be kept in vertical
position.
Support
8