NEC R120d-1E N8100-1955F User Manual page 91

Hide thumbs Also See for R120d-1E N8100-1955F:
Table of Contents

Advertisement

Chapter 2 Preparations
6. Install the battery bracket.
Insert the portion (①) into the duct, and fix
the hook (②) to the duct.
7. Remove the screw securing the riser card.
Hold the both ends of the riser card and lift it
off.
8. Remove the screw, and remove RAID
Controller bracket.
9. Remove the two screws from RAID
Controller, and remove PCI bracket.
Note
Be careful not to contact with other parts.
Express5800/R120d-1E User's Guide
1. Installing Internal Optional Devices
Screws
Screw
91

Advertisement

Table of Contents
loading

Table of Contents