Oil Appliance Commissioning Checklist - Bosch WORCESTER Greenstar Danesmoor 18/25 Installation, Commissioning And Servicing Instruction Manual

Floor standing oil-fired condensing boiler conventional flue & room sealed flue
Hide thumbs Also See for WORCESTER Greenstar Danesmoor 18/25:
Table of Contents

Advertisement

8.9

Oil appliance commissioning checklist

This Commissioning checklist is to be completed in full by the competent
person who commissioned the appliance as a means of demonstrating
compliance with the appropriate Building Regulations and then handed
to the customer to keep for future reference.
Appliance details
Appliance make and model:
Appliance serial number:
Commissioning Engineer
Company name:
Company address:
Telephone number:
Commissioned by
(signature)
(print name)
Commissioning date:
Controls: Tick the appropriate boxes
Time and temperature control to heating
Time and temperature control hot water
Heating zone valves
Hot water zone valves
Thermostatic radiator valves
Automatic by-pass valve fitted to system
Boiler interlock
All Systems
The system has been flushed and cleaned in accordance with BS7593 and appliance manufacturer's instructions?
What system cleaner was used?
What inhibitor was used?
Has a system filter been fitted?
The condensate drain has been installed in accordance with the manufacturer's instructions and/or BS5546/BS6789?
If the condensate pipe terminates externally has the pipe diameter been increased and weatherproof insulation fitted?
Central Heating mode: Measure and record
Central Heating flow temperature
Domestic Hot Water mode: Measure and record
Combination boilers only
Is the installation in a hard water area (above 200ppm)?
If yes, has a water scale reducer been fitted?
What type of scale reducer has been fitted?
Cold Water Inlet temperature
Water flow rate
All installations
Fire valve fitted rated to 85 °C.
Is the flue damper correctly fitted?
Are the hoses from the Air pressure switch correctly routed and free from kinking?
Is a solid non-combustible surface large enough to accommodate the appliance provided?
Is the oil tank and supply clean and free from contamination?
Does the installation comply with current OFTEC Regulation?
The heating and hot water system complies with the appropriate Building Regulations?
The appliance and associated products have been installed and commissioned in accordance with the manufacturer's instructions? Yes  No 
The operation of the appliance and system controls have been demonstrated to and understood by the customer?
Greenstar Danesmoor Kitchen
ErP+
and Kitchen System
Room thermostat and programmer/timer
Load/Weather compensation
Cylinder thermostat and programmer/timer
Fitted
Fitted
Fitted
Fitted
°C
Central Heating return temperature
Yes  No 
Yes  No 
°C
l/min
ErP+ -
6 720 821 686 (2018/04)
IMPORTANT
▶ Leave this manual with the Homeowner.
Commissioning checks
Oil type used is Kerosene
Pump pressure
CO
2
CO
CO/CO
ratio
2
Smoke reading
Flue gas temperature
Flue pressure
Burner model:
 Programmable room thermostat
 Optimum start control
 Combination boiler
 Not required
 Not required
 Not required
 Not required
Provided
Quantity
Hot Water Outlet temperature
Fault finding and diagnosis
Yes 
PSI
%
ppm
°C
Yes 
litres
Yes 
No 
Yes 
Yes 
°C
°C
Yes 
Yes  No 
Yes  No 
Yes  No 
Yes  No 
Yes  No 
Yes  No 
Yes  No 
59

Advertisement

Table of Contents
loading

Table of Contents