Installation; Unpacking The Boiler; Pipework Positions And Flue Opening - Bosch WORCESTER Greenstar Danesmoor 18/25 Installation, Commissioning And Servicing Instruction Manual

Floor standing oil-fired condensing boiler conventional flue & room sealed flue
Hide thumbs Also See for WORCESTER Greenstar Danesmoor 18/25:
Table of Contents

Advertisement

5

Installation

5.1

Unpacking the boiler

CAUTION: Lifting and carrying
▶ Lift only a manageable weight, or ask for help.
▶ When lifting or putting things down, bend your
knees, keep your back straight, and feet apart.
▶ Do not lift and twist at the same time.
▶ Lift and carry object close to your body.
▶ Wear protective clothing and gloves to protect
against sharp edges.
NOTICE: Before installation
▶ All the previous Pre-Installation sections must be
read and requirements met before starting boiler or
flue installation.
Unpacking
It is advised that at least two or more persons are involved in the transfer
of the packaged boiler from the van to the point of delivery.
1. Once the packaged boiler has been delivered, the outer carton is
removed first.
Care should be taken when releasing the straps. If a sharp implement
is used make sure the outer carton is not pierced and that the
implement is used in such a way so that it may not cause personal
injury. All sharp objects must be covered or the blade retracted after
use and put away in a safe place.
2. Lift carton up and away from the boiler.
▶ Remove the plastic bag and upper front protection cover from the
boiler and place safely aside.
▶ Two or more persons are required to move the boiler taking care not
to damage the boiler, panels or the floor.
NOTICE: Heavy objects
▶ At all times the correct method for handling heavy
objects should be strictly observed.
Greenstar Danesmoor Kitchen
ErP+
and Kitchen System
Fig. 30
5.2
Safety
All relevant safety precautions must be undertaken.
Protective clothing, footwear, gloves and safety goggles must be worn as
appropriate.
ErP+ -
6 720 821 686 (2018/04)
1
2

Pipework positions and flue opening

CAUTION: Drilling
▶ Ensure there are no pipes, electrical cables, damp
proof courses or other hazards before drilling.
Installation
6720808218-22.1Wo
25

Advertisement

Table of Contents
loading

Table of Contents