Appropriate Measures For Different Symptom; Outdoor Unit Operation Flow - Samsung AM080 XV Series Service Manual

Hide thumbs Also See for AM080 XV Series:
Table of Contents

Advertisement

Troubleshooting

4-3 Appropriate Measures for Different Symptom

4-3-1 Outdoor Unit Test Operation Flow
Preilminary check for the Test Operation
4-14
Power On
Execute the Auto Trial Operation
Was Auto Trial Operation
Completed?
Yes
Trial Operation available
No
If the Auto Trial Operation is not completed
- UP is displyed(UnPrepared)
Prior to starting the air conditioning operation after the
initial installation and Auto Trial Operation is carried out.
This process, the stable operation to protect the system and verify the
defect of the product.
1. Tracking is complete and after the initial installation, if you do not
have a history of Auto Trial Operation is completed, UP will be dis-
played.
2. Execute the Auto Trial Operation by Tact Switch.
3. UP display disappears after Auto Trial Operation is complete, normal
operation is possible.
4. Auto Trial Operation is completed, if there is a history, normal opera-
tion execution.
LED display the UP (UnPrepared)
Samsung Electronics

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Am100 xv seriesAm120 xv seriesAm140 xv seriesAm160 xv seriesAm180 xv seriesAm200 xv series ... Show all

Table of Contents