18-4
Pattern assignment to calendar
585555
Selection of schedule operation target
Select the schedule operation target.
Selectable targets are site, building, floor, and other groups or R/C groups.
Note
If there is an R/C group with a different schedule set in a group, a schedule cannot be set at that group.
To set up schedules in ascending order
Example)
Group A
Now then, when a different operation pattern is assigned to a group within a group or an R/C group (e.g. build-
ing → floor → group → R/C group) after a common pattern was previously pasted to the group (e.g. site), an
entire schedule can be set using very few steps.
Copyright© 2013-2015 Fujitsu General Limited. All rights reserved.
R/C group 1
R/C group 2
187
Site
Building
Floor
Group
R/C group
When a different schedule is set at R/C group
1 and R/C group 2, a schedule cannot be set at
Group A.