Installing the server enclosure in the rack

CAUTION
For safety reasons, at least 2 people are required to install the
server enclosure in the rack because of its weight and size.
(For Japan, see "安全上のご注意".)
Never lift the server enclosure into the rack using the QRLs on the
front panel.
When connecting and disconnecting cables, observe the relevant
instructions in "Important Information" of the technical manual for
the corresponding rack. The technical manual is supplied with the
corresponding rack.
When installing the rack, ensure that the anti-tilt mechanism is
correctly fitted.
Do not extend more than one server enclosure out of the rack
simultaneously even if the tilt protection is in place. If several server
enclosures are simultaneously extended from the rack, there is a
risk that the rack could tip over. See the safety information of the
rack and the warning label.
If the server enclosure/rack is intended for permanent connection to
the mains only an authorized specialist (electrician) is allowed to
work. Please follow the regulation of each country.
If the server enclosure is integrated into an installation that draws
power from an industrial power supply network with an IEC309 type
connector, the power supply's fuse protection must comply with the
requirements for non-industrial power supply networks for the type
A connector.
3.3

CE conformity

The system complies with the requirements of European
Regulations. Find the CE declaration on certificate portal:
https://sp.ts.fujitsu.com/sites/certificates/default.aspx
36
Upgrade and Maintenance Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy cx2560 m6

Table of Contents