Replacing The Ocp Module - Fujitsu PRIMERGY CX2550 M6 Upgrade And Maintenance Manual

Table of Contents

Advertisement

Expansion cards and OCP mezzanine cards
▶ Insert the OCP dummy cover with the left side first (1).
▶ While pressing the latch on the right side outside (2) insert it completely in
the direction of the arrow (3).
Concluding steps
In case of CX2550 M6 liquid cooling, reconnect all cables, see
"Installing the LC kit" on page
"Installing a riser module" on page
"Installing the CX2550 M6 or CX2560 M6 server node" on page
▶ Reconnect all external cables.
"Switching on the server node" on page
"Enabling the boot watchdog" on page
6.4.3

Replacing the OCP module

Upgrade and Repair Unit
(URU)
Tools:
– Philips PH2/ (+) No. 2 screw driver
– For Mellanox OCP: T6 Torx screw driver
Preliminary steps
"Disabling the boot watchdog" on page
▶ Locate the desired server node with the ID button.
"Shutting down the server node" on page
▶ Remove all external cables from the server node.
"Removing server nodes from the server enclosure" on page
"Removing a riser module" on page
104
201.
51.
73.
62.
49.
Upgrade and Maintenance Manual
59.
Hardware: 10 minutes
45.
57.
45.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy cx2560 m6

Table of Contents