Installing the Cisco MDS 9148V-K9 Switch
This chapter describes how to install a Cisco MDS 9148V-K9 switch and its components.
Before you install, operate, or service the system, see the
the Cisco MDS 9000 Family
Warning
Warning
Preinstallation
Cisco MDS 9000 Series Telco and EIA Shelf Bracket
The optional Telco and EIA Shelf Bracket Kit (part number DS-SHELF=) can temporarily or permanently
support the switch during installation. After the front rack-mount brackets are securely attached to the
rack-mounting rails, the shelf bracket can be removed.
The Telco and EIA Shelf Bracket kit supports the following configurations:
• A two-post Telco rack
• A four-post EIA rack
document for important safety information.
This unit is intended for installation in restricted access areas. A restricted access area can be accessed
only through the use of a special tool, lock and key, or other means of security. Statement 1017
Only trained and qualified personnel should be allowed to install, replace, or service this equipment.
Statement 1030
Preinstallation, on page 1
Installing the Switch, on page 6
Grounding the Switch, on page 12
Installing and Removing Components, on page 13
Regulatory Compliance and Safety Information for
Installing the Cisco MDS 9148V-K9 Switch
1

Advertisement

Table of Contents
loading

Summary of Contents for Cisco 9000 Series

  • Page 1 Installing the Cisco MDS 9148V-K9 Switch This chapter describes how to install a Cisco MDS 9148V-K9 switch and its components. Before you install, operate, or service the system, see the Regulatory Compliance and Safety Information for the Cisco MDS 9000 Family document for important safety information.
  • Page 2: Shelf-Installation Guidelines

    Installing the Cisco MDS 9148V-K9 Switch Shelf-Installation Guidelines Note Telco and EIA Shelf Bracket optional kit is not provided with the switch; to order the kit, contact your switch supplier. This section describes the procedure for installing a switch in a rack or cabinet using the optional Telco and EIA Shelf Bracket Kit.
  • Page 3 Installing the Cisco MDS 9148V-K9 Switch Installing the Shelf Bracket Kit into a Four-Post EIA Rack Figure 1: Installing the Shelf Bracket Kit into an EIA Rack Rack-mounting post Crossbar Shelf bracket 10-32 screws Slider post To install the shelf brackets in an EIA rack, follow these steps:...
  • Page 4: Pre-Installation Guidelines

    Follow these guidelines when installing the switch: • Each new switch requires a license. See the Cisco MDS 9000 Family NX-OS Licensing Guide instructions on installing a license. • Plan your site configuration and prepare the site before installing the switch.
  • Page 5: Unpacking And Inspecting The Switch

    The switch is thoroughly inspected before shipment. If any damage occurs during transportation, or if any item is missing, contact your customer representative immediately. If you purchased Cisco support through a Cisco reseller, contact the reseller directly. If you purchased support directly from Cisco, contact Cisco Technical Support.
  • Page 6: Installing The Switch In A 4-Post Rack

    Installing the Cisco MDS 9148V-K9 Switch Installing the Switch • Model and serial number of the damaged unit • Description of damage • Effect of damage on the installation 3. Check if all the power supplies and the fan trays have the expected direction of airflow. Port-side intake airflow modules have a red coloring, and port-side exhaust airflow modules have blue coloring.
  • Page 7 Installing the Cisco MDS 9148V-K9 Switch Installing the Switch in a 4-Post Rack Step 1 Install two rack-mount brackets to the switch as follows: a. Position a rack-mount bracket so that three of its screw holes are aligned to the screw holes on the side of the chassis.
  • Page 8 Installing the Cisco MDS 9148V-K9 Switch Installing the Switch in a 4-Post Rack b. Position a slider rail at the desired level side of the rack and use two 12-24 screws or two 10-32 screws, depending on the rack thread type, to attach the slider rail to the rack. Tighten the 12-24 screws to 30 in-lb (3.39 N·m) of torque, or tighten the 10-32 screws to 20 in-lb (2.26 N·m) of torque.
  • Page 9: Installing The Switch Into A 2-Post Rack

    Installing the Cisco MDS 9148V-K9 Switch Installing the Switch into a 2-Post Rack c. Holding the chassis level, insert two screws (12-24 or 10-32, depending on the rack type) into each of the two brackets (using a total of four screws), and into the cage nuts or threaded holes in the rack or cabinet posts.
  • Page 10 Installing the Cisco MDS 9148V-K9 Switch Installing the Switch into a 2-Post Rack Figure 3: Installing Rack-Mount Brackets on the Front Side of the Chassis Step 2 If you are installing the chassis into an ungrounded rack, you must attach a customer-supplied grounding wire to the chassis.
  • Page 11 Installing the Cisco MDS 9148V-K9 Switch Installing the Switch into a 2-Post Rack Figure 4: Installing the Switch onto the 2-Post Rack From the Front Side of the Chassis Figure 5: Installing the Switch onto the 2-Post Rack From the Rear Side of the Chassis c.
  • Page 12: Grounding The Switch

    Installing the Cisco MDS 9148V-K9 Switch Grounding the Switch Step 4 If you have attached a grounding wire to the chassis grounding pad, connect the other end of the wire to the facility ground. Grounding the Switch The switch chassis is automatically grounded when you install the switch properly in a grounded rack with metal-to-metal connections between the switch and rack.
  • Page 13: Installing And Removing Components

    Installing the Cisco MDS 9148V-K9 Switch Installing and Removing Components Grounding cable, with 0.75 in. (19 mm) of insulation that is stripped from one end, which is inserted into the grounding lug and crimped in place. Step 4 Prepare the other end of the grounding wire and connect it to an appropriate grounding point in your site to ensure an adequate earth ground for the switch.
  • Page 14 Installing the Cisco MDS 9148V-K9 Switch Installing the ESD Grounding Strap Note These images are for only representation purposes. The chassis' actual appearance and size may vary. Figure 7: Wearing the ESD Strap Installing the Cisco MDS 9148V-K9 Switch...
  • Page 15: Installing And Removing Power Supply Units

    Installing the Cisco MDS 9148V-K9 Switch Installing and Removing Power Supply Units Figure 8: Handling the Chassis Installing and Removing Power Supply Units This section provides instructions for installing and removing the power supply units in the switch. Installing Power Supply Units You can replace one power supply unit (PSU) while the other one provides power to the switch.
  • Page 16: Removing Power Supply Units

    Installing the Cisco MDS 9148V-K9 Switch Removing Power Supply Units • There must be an earth ground connection to the chassis to which you are installing the replacement module. Typically, the chassis is grounded by its metal-to-metal connection with a grounded rack. If you...
  • Page 17: Installing A Fan Module

    Caution The Cisco MDS 9000 Series Switches have internal temperature sensors that can shut down the system if the temperature within the chassis exceed certain safety thresholds. To accurately monitor the system temperature, the temperature sensors require sufficient airflow through the chassis. In the event that a fan module is removed from the chassis and the airflow is reduced, the system will bypass the temperature sensor information and shut down after five minutes to prevent undetected overheating.
  • Page 18 Installing the Cisco MDS 9148V-K9 Switch Removing a Fan Module Warning While removing the fan module, keep your hands and fingers away from the spinning fan blades. Let the fan blades completely stop before you remove the fan module. Statement 258...