Start/End Of Season Operations - Zanussi ZPAC9002 Manual

9000/11000 btu portable air conditioner
Table of Contents

Advertisement

START/END OF SEASON OPERATIONS

Start of season checks
Make sure the power cable and plug are undamaged and the earth
system is efficient.
Follow the installation instructions within this manual precisely.
End of season operations
To empty the internal circuit completely of water, remove the cap (Fig
32) and run all the water off into a pan.
When all the water has been drained, firmly put the cap back in
place. Clean the filter and dry thoroughly before putting it back into
the appliance.
Follow the steps below to install the power cord storage hooks.
1. Position the hooks as shown below and place them into the holes,
then turn the hooks 45° clockwise.
Page 25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zpac11001

Table of Contents