Black & Decker BBD20HS Instruction Manual page 11

Beer kegerator
Table of Contents

Advertisement

Available languages

Available languages

SET UP & USE
INSTALLING THE GUARDRAIL
Following these steps below to install the guardrail.
1.
Place the guardrail on top of the cabinet.
2.
Align all support feet of the guardrail with the holes on the top of the unit.
INSTALLING THE CO2 REGULATOR AND THE CO2 CYLINDER
Follow these steps to safely install the CO2 regulator and CO2 cylinder. You must read
and understand the following procedures for the CO2 cylinders before installation.
NOTE: Your CO2 cylinder has DOT (USA Department of Transportation) approval,
however the cylinder has been shipped empty to avoid any possible accidents
during transportation. When you purchase the first keg of beer, you must also
have your CO2 cylinder filled at your local supplier.
1.
Install the CO2 gas line tube to the regulator by attaching one end of the tube to
the hose barb connection on the CO2 regulator. (See illustration E)
2.
Attach the regulator to the CO2 cylinder by screwing the regulator nut onto the
cylinder valve and tightening with an adjustable wrench. (See illustration F)
F
E
Page 11

Advertisement

Table of Contents
loading

Table of Contents