D-Link GO-SW-16G, GO-SW-24G Quick Installation Guide

D-Link GO-SW-16G, GO-SW-24G Quick Installation Guide

Also See for GO-SW-16G:

Advertisement

D-Link GO-SW-16G, GO-SW-24G Quick Installation Guide

SET UP

Set up

LED INDICATIONS

LED Color State Description
Power
(system)
Green Solid Light Device is powered on
Light off Device is powered off
Link/Act/
Speed (port)
Green Solid Light Device connected at 1000 Mbps
Blinking Activity on the port
Amber Solid Light Device connected at 10/100 Mbps
Blinking Activity on the port

RACK INSTALLATION

To install in a rack, attach the mounting brackets to the switch's side panels (one on each side) and secure them with the screws provided. Then, use the hardware provided with the equipment rack to mount the switch in the rack.
Rack Installation

INSTALLING POWER CORD RETAINER

To prevent accidental removal of the AC power cord, it is recommended to install the power cord clip together with the power cord.

  1. With the rough side facing down, insert the Tie Wrap into the hole below the power socket.
    Installing Power Cord Retainer - Step 1
  2. Plug the AC power cord into the power socket of the Switch.
    Installing Power Cord Retainer - Step 2
  3. Slide the Retainer through the Tie Wrap until the end of the cord.
  4. Circle the tie of the Retainer around the power cord and into the locker of the Retainer.
  5. Fasten the tie of the Retainer until the power cord is secured.

TECHNICAL SUPPORT

dlink.com/support

Documents / Resources

References

Download manual

Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.

Download D-Link GO-SW-16G, GO-SW-24G Quick Installation Guide

Advertisement

Need Assistance?

Do you have a question about the GO-SW-16G that isn't answered in the manual? Leave your question here.

Error while submitting your question. Please, reload page and try again.

Thank you! Your question has been received!

Table of Contents