INSTALLATION PLACE AND POWER SOURCE FACILITY
 Installation Place
Avoid the direct sunshine and rain, and install in
an indoor place with less humidity and dust.
(Indoor ambient temperature -10 to 40℃)
Install the welding source 20cm or more away from the
wall: when installing two or more units, they should
be separated 30 cm or more from each other.
 Power Source Facility
Power source
Frequency
Commercial power
Facility
source
capacity
Engine generator
Primary line current
Welding
Cable
input side
sectional
Welding
area
output side
Power source
Frequency
Commercial power
Facility
source
capacity
Engine generator
Primary line current
Welding
Cable
input side
sectional
Welding
area
output side
YD-200KR2HD□ YD-200KR2HG/N□ YD-200KR2HK□
3-Phase 220V
50/60Hz (Switchable on the printed circuit board)
Twice large than 7.6 kVA with compensating winding.
Approx. 20A
source
2
8mm
or more
source
YD-350KR2HD□ YD-350KR2HG/N□ YD-350KR2HK□
3-Phase 220V
50/60Hz (Switchable on the printed circuit board)
Twice large than 18.1 kVA with compensating winding.
Approx. 47.5A
source
2
14mm
or more
source
Do not install in a place where a metallic foreign
substance may enter inside the welding source.
Install in a place where welding arc is not exposed
to the wind. (Set up a screen. etc. to prevent the
wind.)
YD-200KR2
3-Phase 380V
3-Phase 440V
10kVA
Approx. 11.5A
Approx. 10A
2
5.5mm
or more
5.5mm
2
38mm
or more
YD-350KR2
3-Phase 380V
3-Phase 440V
20kVA
Approx. 27.5A
Approx. 23A
2
8mm
or more
8mm
2
38mm
or more
PREPARATIONS
YD-200KR2HJ□
3-Phase 415V
Approx. 10.6A
2
2
or more 5.5mm
YD-350KR2HJ□
3-Phase 415V
Approx. 25.2A
2
2
or more
8mm
or more
or more

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yd-350krYd-500kr

Table of Contents