Static Checkout; Equipment Recommended; General Instructions - Honeywell 7800 Series Installation Instructions Manual

Relay modules
Hide thumbs Also See for 7800 Series:
Table of Contents

Advertisement

SELECTABLE CONFIGURATION JUMPERS
RUN/TEST SWITCH
Fig. 4. Selectable site-configurable jumpers.
Jumper Number
JR1
Pilot Flame Establishing
Period (PFEP)
JR2
JR3
Start-up Interlock Check
SERVICE NOTE:Clipping and removing a site-configurable jumper enhances the level of safety. Removal after 200 hours of
main valve operation will result in a hard lockout, Code 110.

STATIC CHECKOUT

After checking all wiring, perform this checkout before
installing the RM7845A on the subbase. These tests verify the
Q7800 Wiring Subbase is wired correctly, and the external
controllers, limits, interlocks, actuators, valves, transformers,
motors and other devices are operating properly.
WARNING
Explosion and Electrical Shock Hazard.
Can cause serious injury, death or equipment
damage.
1. Close all manual fuel shutoff valve(s) before starting
these tests.
2. Use extreme care while testing the system. Line
voltage is present on most terminal connections
when power is on.
3. Open the master switch before installing or
removing a jumper on the subbase.
4. Before continuing to the next test, be sure to
remove test jumper(s) used in the previous test.
5. Replace all limits and interlocks that are not
operating properly. Do not bypass limits and
interlocks.
M22634
Table 7. Site Configurable Jumper Options.
Description
10 seconds
Disabled
RM7845A 7800 SERIES RELAY MODULES
Intact
Clipped
4 seconds
Enabled
CAUTION
Equipment Damage Hazard.
Improper testing can damage equipment.
Internal surge protectors can break down and conduct
a current, causing the RM7845A to fail the dielectric
test or possibly destroy the internal lightning and high
current protection. Do not perform a dielectric test with
the RM7845A installed.

Equipment Recommended

1. Voltmeter (1M ohm/volt minimum sensitivity) set on the
0-300 Vac scale.
2. Two jumper wires; no. 14 wire, insulated, 12 inches
(304.8 mm) long with insulated alligator clips at both
ends.

General Instructions

1. Perform all applicable tests listed in Static Checkout,
Table 8, in the order listed.
2. Make sure all manual fuel shutoff valve(s) are closed.
3. Perform only those tests designated for the specific
RM7845A model being tested.
4. Raise the setpoint of the operating controller to simulate
a call for heat.
11
RM7845A Type
All
All
66-1147—1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rm7845a

Table of Contents