C A U T I O N
Supply electrical power to the system for approximately 12 hours
before start-up or a long shutdown. Do not start the system
immediately after power supply, it may cause a compressor failure
because the compressor is not heated well.
When the system is started after a shutdown longer that approximately
3 months, it is recommended to check the system by your service
contractor.
4 ACCESSORIES FACTORY-SUPPLIED
Ring core (only for RAS-(4-6)FSVNME1)
Cable tie (only RAS-(4-6)FSVNME1)
Installation and operation manual

5 TRANSPORTATION AND HANDLING

!
C A U T I O N
Transport the products as close to the installation location as practical
before unpacking. Do not put any material on the products.
Apply four lifting wires on to the outdoor, when lifting it by crane.
Model
a (m)
RAS-(4-6)FS(V)NME1
RAS-(8-12)FSXNME1
When hanging the unit, ensure a balance of the unit, check
safety and lift it up smoothly. Two or more personnel should be
used to move the unit. Do not remove any packing materials.
Hang the unit under packing condition with 2 rope.
For safety reasons ensure that the outdoor unit is lifted smoothly
and does not lean.
11
PMML0532 rev.1 - 12/2020
Pipes
8HP
Gas
pipe
OD19.05→ID15.88 OD19.05→ID22.2 / 25.4
Liquid
-
pipe
Name
Declaration of conformity
Transparent label
CD-ROM
h (m)
c (m)
5.8
6.2
2.1
6.6
7.0
2.0
Turn OFF the main switch when the system is to be stopped for a long
period of time. If the main switch is not turned OFF, electricity will be
used, because the oil heater is always energised during compressor
stopping.
Make sure that the outdoor unit is not covered with snow or ice.
If covered, remove it by using hot water (up to 50°C). If the water
temperature is higher than 50 °C, it will cause damage to plastic parts.
10HP
12HP
OD19.05→ID22.2 / 25.4
-
OD9.52→ID12.7
Qty
Comments
2
Yellow for L,N wire / Green for Earth wire
2
For attaching the ring core
1
-
1
For attaching in the refrigerant label
1
Installation and operation unit instructions
1
Installation and operation unit instructions
> 60º
0.7 -1.0 m
x2
c
a

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents