Introduction

Scope of this document
Manual order
DEC 2000
SC 300 BTS Hardware Installation, ATP and FRU Procedures
This document provides information pertaining to the hardware
installation, cabling installation, ATP and Field Replaceable Unit (FRU)
procedures of the Motorola MicroCell and PicoCell SC 300 CDMA
Base Transceiver Subsystem (BTS) equipment.
The FRU procedures do not cover the replacement of modules inside the
unit.
An individual SC 300 BTS unit will be referred to as the "unit" for the
remainder of this document. A BTS site that contains one or more
SC 300 BTS units will be referred to as the "BTS" for the remainder of
this document.
For detailed installation information of non-Motorola equipment, refer to
the vendor manuals provided with such equipment.
The installation order is the order of the manual starting at Chapter 1 and
continuing through Chapter 5. After hardware installation has been
completed, run the ATP for the system by following the procedures
defined in Chapter 6 of this manual.
Chapter 1
"Introduction" — This is a brief outline of the manual. Also provided is
a list of additional documents and tools necessary to complete the
procedures.
Chapter 2
"Site Preparation" — This chapter contains the necessary information to
verify the condition of the site.
Chapter 3
"Installing Mounting Bracket and Remote GPS" — This chapter
contains the necessary information to install the MicroCell/Surge
Suppressor or PicoCell mounting bracket on a wall, pole, rack or ceiling.
Chapter 4
"Preparing Site Cabling for Sites Equipped with Customer–Supplied
Site I/O Interface" — This chapter contains the procedures for installing
the external cabling for sites equipped with the customer–supplied Site
I/O interface.
Chapter 5
"Preparing Site Cabling for Sites Equipped with optional Primary Surge
Suppressor" — This chapter contains the procedures for installing the
external cabling for sites equipped with the optional Primary Surge
Suppressor.
Chapter 6
"Installing the Unit and Installation Check Off List" — This chapter
contains procedures for installing the unit, mounting the Solar Cover to
the chassis and final Installation Check Off List.