Zanussi ZOG11311XK User Manual page 17

Table of Contents

Advertisement

8. Turn the gas oven control knob from 240 to
minimum.
Control the flame. If the flame goes out, do the
procedure from point 1 to point 8 again. There
must be a small regular flame on the gas oven
burner crown.
The manufacturer objects liability if you
do not obey to this safety measures.
Building In
Conditions for building-in:
• Only set up the appliance in a kitchen or in a
kitchen-dining room.
• Do not set up the appliance in a bathroom or
a bedroom.
• You can install the appliance "built-in" or
"built-under":
560
570
2
www.zanussi.com
540
20
110mm
590
65cm²
594
• The related illustrations show the necessary
• The dimensions of the built-in cabinet must
• There must be a minimum clearance of 4 mm
• When you install the appliance "built-under"
• The materials must be resistant to a tempera-
110mm
min.
550mm
580mm
560-570mm
65cm²
x2
min.
550mm
593mm
560-570mm
x2
130cm²
dimensions of the oven and the cabinet (in
millimetres).
agree with the related illustrations.
between the top surface of the appliance and
the inner top of the cabinet.
(below a hob), install the hob before the oven
unit.
ture increase of minimum 60 °C above the
ambient temperature.
130cm²
min. 4mm
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zog11311

Table of Contents