Figure 2.15 Installing Hybrid Cable (3) - Samsung Smart MBS RRH-C2A Installation Manual

Table of Contents

Advertisement

Smart MBS RRH-P4 Installation Manual/Ver.2.0
E) Install pulling wire to the 1m point of (RRH side) hybrid cable's junction box(breakout point) bottom.
Wind the pulling wire by 7 times or more to the 1 m or more length of hybrid cable.
Min. 1 m
Pulling Wire
Junction Box
(Breakout Point)
Min. 1 m
7
6
5
4
3
2
1

Figure 2.15 Installing Hybrid cable (3)

© SAMSUNG Electronics Co., Ltd.
2-21

Advertisement

Table of Contents
loading

Table of Contents