5.5. TRANSPORTATION

5.5.1. Transportation by Rigging
Hook wire cables and apply field-supplied spreader bars on
the top of the unit (see figure in the next page) to prevent
the unit panels from damage due to cable scratches. The
unit should remain in an upright position even during
rigging. The wire cable to rig the unit shall be three times
stronger than the unit weight. Check to ensure that the
rigging bolts are tightly fixed to the unit. The rigging angle
shall be greater than 60° as shown. The weight of the unit
is indicated on the unit label.
5.5.2. Transportation by Roller
When rolling the unit, put at least 7 equal-sized rollers
under the base frames. Each roller must carry both the
outer frames, and must be suited to balance the unit (see
the centre of gravity in page).
Fig.5.Transportation by Roller.
!
DANGER:
Do not stand below the unit when rigging.
#
CAUTION:
Put clothes between wires and the unit to avoid
damages.
Rigging shall be performed by the instruction drawing
attached to the unit.
(Here the example of RCUE120AG1 is shown).
5.5.3. DECLINING THE UNIT DURING
TRANSPORTATION.
"
WARNING:
Do not decline the unit more than an angle of 15
shown in the figure during transportation. If declined
more than an angle of 15
Fig.6. Declining the unit.
+
Electrical Box
Wire length
,
Min.3000mm.
(Field supplied)
Spreader Bar
-
(Field Supplied)
Removable
.
Rigging Holes
/
(4-∅50)
°
as
°
, the unit may fall down.