Read First; Check Product Purchase - Toshiba Q9 Plus Bypass ASD Installation & Operation Manual

Hide thumbs Also See for Q9 Plus Bypass ASD:
Table of Contents

Advertisement

1. Read first

1.1

Check product purchase

Before using the product you have purchased, check to make sure that it is exactly what you ordered.
Use an inverter that conforms to the specifications of power supply and three-phase induction
motor being used. If the inverter being used does not conform to those specifications, not only will
the three-phase induction motor not rotate correctly, but it may also cause serious accidents
Mandatory
through overheating and fire.
action
Rating label
Model
Power supply
Motor capacity
Carton box
Type indication label
Setup sheet
Caution
Inverter main unit
Rating label
Danger label
Danger label
A-1
Name plate
Name plate
Inverter Type
Inverter rated
output capacity
Power supply
Rated input
current
Rated output
current
E6581611
1

Advertisement

Table of Contents
loading

Table of Contents