Service Clearances - Bosch FHP RT-20 Installation, Operation And Maintenance Manual

Energy recovery ventilators
Table of Contents

Advertisement

Service Clearances

RT-20, -45, -55, and -90 units require minimum clearances for access on all sides for routine maintenance. Filter
replacement, drain pan inspection and cleaning, energy wheel cassette inspection, fan bearing lubrication and
belt adjustment are examples of routine maintenance that must be performed. Blower and motor assemblies,
energy wheel cassette, coil and filter sections are always provided with a service door or panel for proper
component access. Clearances for component removal may be greater than the service clearances, refer to
drawings for these dimensions.
RT-20
RT-45
RT-55
RT-90
EXHAUST
HOOD
36 IN
ACCESS PANEL
Clearances for service and component removal on RT-20 and RT-45
* Clearance for energy wheel removal on RT-20
** Clearance for energy wheel removal on RT-45
EXHAUST
HOOD
42 IN
ACCESS PANEL
Clearances for service and component removal on RT-55 and RT-90
36 IN
ELECTRICAL BOX
EXHAUST AIR
INTAKE
ACCESS PANEL
*48 IN
**64 IN
42 IN
ELECTRICAL BOX
EXHAUST AIR
INTAKE
ACCESS PANEL
42 IN
ACCESS PANEL
ACCESS PANEL
36 IN
MINIMUM
52 IN
CLEARANCE
WITH IG HEATER
ACCESS PANEL
ACCESS PANEL
36 IN
MINIMUM
52 IN
CLEARANCE
WITH IG HEATER
Model RT Energy Recovery Unit
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fhp rt-45Fhp rt-55Fhp rt-90

Table of Contents